Home |
Feedback |
122 members


Join with Aptibook
http://www.aptibook.com

A works twice as fast as B. If B can complete a work in 12 days independently, the number of days in which A and B can together finish the work in: - Aptibook
Welcome to concepts confluence of Aptibook. Read the content below, update with your own answers here. No registration required. Let's bring the confluence of brilliant concepts.

A. 4 days

B. 6 days

C. 8 days

D. 18 days

Answer : 4 days

Ratio of rates of working of A and B = 2: 1.

So, ratio of times taken = 1: 2. ( ஃ Time and work are inversely proportional)

B’s 1 day’s work = 1/12

ஃ A’s 1 day’s work = 1/6 (ஃ 2 times of B’s work)

ஃ (A + B)’s 1 day’s work = (1/6 + 1/12) = 3/12 = 1/4

So, A and B together can finish the work in 4 days.

Note: You can add your valuable points to the below content. No registration required for posting.
Please make sure that your answer is relevant to the given question.

Your answer

Name :  
Mail ID : 

Dear, Do you know answers for these questions?

• A software engineer has the capability of thinking 100 lines of code in five minutes and can type 100 lines of code in 10 minutes. He takes a break for five minutes after every ten minutes. How many lines of codes will he complete typing after an hour?

• A man can do a piece of work in 5 days, but with the help of his son, he can do it in 3 days. In what time can the son do it alone?

• Sakshi can do a piece of work in 20 days. Tanya is 25% more efficient than Sakshi. The number of days taken by Tanya to do the same piece of work is

• Kim can do a work in 3 days while David can do the same work in 2 days. Both of them finish the work together and get Rs.150. What is the share of Kim ?

• 10 women can complete a work in 7 days and 10 children take 14 days to complete the work. How many days will 5 women and 10 children take to complete the work?

• A does a work in 10 days and B does the same work in 15 days. In how many days they together will do the same work?

• A chocolate maker has to make 25 pieces each of length 3cm from a square shaped bar of length 75cm. If he takes 5 seconds to cut a single piece, then the time(seconds) taken to make 25 pieces is: (Note: The chocolate maker makes single piece of cake for a cut)

• There are 200 questions on a 3 hr examination.Among these questions are 50 mathematics problems. It is suggested that twice as much time be spent on each maths problem as for each other question. How many minutes should be spent on mathematics problems ?

• A can do a work in 18 days, B in 9 days and C in 6 days. A and B start working together and after 2 days C joins them. What is the total number of days taken to finish the work ?

• A can do a work in 15 days and B in 20 days. If they work on it together for 4 days, then the fraction of the work that is left is: